Chapter 26 — Constitutional Evolution Framework
Part III — Deliberation, Ratification and Constitutional Transition
Part III defines the institutional and operational execution layer through which a Constitutional Change Proposal becomes a ratified, released, activated and monitored Constitutional Baseline.
Part I established:
- Evolution foundations;
- the Core-change boundary;
- Constitutional Baselines;
- Constitutional Change Proposals;
- Change Classes;
- Protected Invariants;
- authority;
- lifecycle;
- impact analysis;
- Amendment Packages;
- runtime integration;
- historical trust.
Part II established:
- Constitutional Change Sets;
- typed Amendment Operations;
- identity and Namespace evolution;
- structural and behavioural evolution;
- authority, security and Publication evolution;
- Module and Component evolution;
- Extension-Point evolution;
- compatibility;
- grandfathering;
- migration obligations;
- Transformation Contracts;
- dependency-driven impact propagation.
Part III governs the institutional execution of those artefacts.
It defines:
- Evolution Programmes;
- constitutional change portfolios;
- review plans;
- evidence architecture;
- consultation;
- stakeholder participation;
- deliberation;
- dissent;
- challenge;
- ratification procedure;
- ratification thresholds;
- constitutional release assembly;
- baseline publication;
- transition programmes;
- activation;
- phased rollout;
- runtime admission;
- post-activation monitoring;
- corrective control;
- constitutional incidents;
- emergency suspension;
- assurance;
- audit;
- public verification;
- institutional provenance.
The governing principles are:
Constitutional evolution SHALL be governed as an institutional decision process, not as a software release workflow with constitutional labels.
Evidence, consultation, deliberation, ratification, release and activation SHALL remain distinct states with distinct authorities and receipts.
A ratification decision SHALL bind to an exact Candidate Amendment, exact Constitutional Change Set, exact Amendment Package digest and exact target Baseline Manifest.
A Constitutional Baseline SHALL not become active merely because it has been ratified or published. Activation requires successful compilation, migration readiness, Runtime Admission, transition authority and verification.
A technically successful activation SHALL not cure an invalid ratification, incomplete impact analysis or prohibited constitutional change.
Dissent, challenge, minority opinion, conflicts of interest and unresolved limitations SHALL remain visible throughout the constitutional history.
Post-activation monitoring SHALL evaluate whether the ratified constitutional objective was achieved and whether tenant, Extension, Publication, security or historical-trust consequences differ materially from the approved analysis.
Constitutional assurance SHALL attest only to an exact subject, baseline, scope, criteria, evidence set and period. Assurance SHALL not substitute for ratification.
The institutional execution path is:
Constitutional Change Portfolio
│
▼
Evolution Programme
│
├── Programme Charter
├── Change Proposals
├── Baseline Scope
├── Review Plan
├── Evidence Plan
├── Stakeholder Plan
├── Migration Plan
└── Transition Plan
│
▼
Constitutional Review
│
├── Semantic
├── Legal and Regulatory
├── Security and Tenant Isolation
├── Data and Graph
├── Runtime
├── Extension
├── Publication
├── Assurance
└── Historical Trust
│
▼
Consultation and Deliberation
│
├── Evidence Submission
├── Questions
├── Responses
├── Alternatives
├── Dissent
├── Challenge
└── Revision
│
▼
Review Freeze
│
▼
Ratification Procedure
│
├── Eligibility
├── Quorum
├── Threshold
├── Recusal
├── Voting or Approval
├── Conditions
└── Signatures
│
▼
Constitutional Baseline Release
│
▼
Transition and Runtime Activation
│
▼
Post-Activation Monitoring, Assurance and Audit
Part III SHALL remain independent of any one voting system, workflow engine, issue tracker, meeting platform, signature technology, release platform, CI/CD system, observability platform, public-consultation portal or audit application.
26.25. Constitutional Evolution Programme and Portfolio Governance
A Constitutional Evolution Programme coordinates one or more related Constitutional Change Proposals, Change Sets, Amendment Packages, migrations and Baseline Releases.
An Evolution Programme SHALL preserve the independent identity and ratification status of each constitutional change while governing shared dependencies and transition.
26.25.1. Evolution Programme Identity
Every Evolution Programme SHALL possess:
- Evolution Programme Identifier;
- canonical name;
- Programme Charter;
- programme owner;
- constitutional sponsor;
- source Baseline or Baselines;
- target Baseline objective;
- included Constitutional Change Proposals;
- included Constitutional Change Sets;
- affected Modules;
- affected Components;
- affected Extension Points;
- affected Extensions;
- affected tenants and white-label deployments;
- jurisdictions;
- schedule;
- budget or resource profile where applicable;
- risk profile;
- lifecycle;
- version;
- provenance.
26.25.2. Evolution Programme Types
Programme Types MAY include:
- Single-Amendment Programme;
- Coordinated Regulatory Programme;
- Framework Alignment Programme;
- Security Evolution Programme;
- Core Architecture Programme;
- Module Reorganisation Programme;
- Extension-Promotion Programme;
- Constitutional Correction Programme;
- Emergency Evolution Programme;
- Long-Term Baseline Modernisation Programme.
26.25.3. Programme Charter
A Programme Charter SHALL define:
- constitutional objective;
- problem statement;
- source authority;
- scope;
- excluded scope;
- governing baselines;
- included proposals;
- decision authority;
- review model;
- stakeholder model;
- migration objective;
- transition objective;
- success criteria;
- failure criteria;
- stop conditions;
- provenance.
26.25.4. Programme Scope
Scope MAY include:
- one constitutional artefact;
- one constitutional document;
- one Module;
- multiple Modules;
- one Runtime generation;
- one regulatory domain;
- one jurisdiction;
- one tenant cohort;
- one white-label population;
- the global Core baseline.
26.25.5. Programme Exclusions
Excluded subjects SHALL be explicit where their omission could affect:
- compatibility;
- migration;
- security;
- tenant isolation;
- Extensions;
- Publications;
- assurance;
- historical reconstruction.
26.25.6. Constitutional Change Portfolio
A Constitutional Change Portfolio is the governed inventory of:
- proposed changes;
- admitted proposals;
- active Evolution Programmes;
- Candidate Amendments;
- ratified Amendments;
- pending migrations;
- transition baselines;
- corrective amendments;
- emergency amendments;
- deferred or rejected proposals.
26.25.7. Portfolio Entry
Every Portfolio Entry SHALL identify:
- proposal or programme;
- owner;
- sponsor;
- source baseline;
- target baseline;
- Change Classes;
- severity;
- dependencies;
- status;
- target dates;
- risk;
- authority;
- provenance.
26.25.8. Portfolio Prioritisation
Prioritisation MAY consider:
- legal deadline;
- regulatory deadline;
- security urgency;
- constitutional defect severity;
- tenant exposure;
- Publication exposure;
- Extension exposure;
- migration complexity;
- dependency criticality;
- resource availability;
- strategic value.
Commercial value SHALL not override mandatory constitutional or regulatory priority without explicit authority.
26.25.9. Programme Dependency
A Programme Dependency SHALL preserve:
- source programme;
- dependent programme;
- dependency type;
- affected Change Sets;
- sequencing;
- risk;
- resolution;
- provenance.
26.25.10. Cross-Programme Conflict
A conflict MAY arise where programmes:
- modify the same Core artefact;
- assume incompatible source baselines;
- assign conflicting target semantics;
- define incompatible effective times;
- create competing Module ownership;
- create incompatible Extension Points;
- require conflicting tenant migrations.
26.25.11. Programme Sequencing
Sequencing SHALL identify:
- prerequisite programmes;
- parallelisable programmes;
- mutually exclusive programmes;
- shared migrations;
- shared Baseline Releases;
- shared transition windows;
- provenance.
26.25.12. Programme Consolidation
Programmes MAY be consolidated where:
- objectives overlap materially;
- source baselines align;
- authority aligns;
- review remains complete;
- impact analysis is recomputed;
- proposal identities remain preserved;
- provenance remains complete.
26.25.13. Programme Separation
A programme SHOULD be separated where:
- Change Classes require different thresholds;
- jurisdictions differ materially;
- emergency and ordinary changes are mixed;
- one proposal can proceed independently;
- combined scope prevents meaningful deliberation;
- one change creates unacceptable coupling.
26.25.14. Programme Risk Register
The risk register SHOULD include:
- semantic risk;
- authority risk;
- tenant-isolation risk;
- security risk;
- migration risk;
- Extension risk;
- Publication risk;
- assurance risk;
- operational risk;
- schedule risk;
- historical-trust risk;
- stakeholder legitimacy risk.
26.25.15. Programme Decision Log
A Decision Log SHALL preserve:
- decision identity;
- subject;
- options;
- evidence;
- decision maker;
- authority;
- decision;
- conditions;
- time;
- provenance.
Programme decisions SHALL not substitute for ratification decisions.
26.25.16. Programme Stage Gates
Stage Gates MAY include:
- Charter Approval;
- Proposal Admission;
- Analysis Readiness;
- Deliberation Readiness;
- Review Freeze Readiness;
- Ratification Readiness;
- Release Readiness;
- Migration Readiness;
- Activation Readiness;
- Closure Readiness.
26.25.17. Programme Reporting
Programme reporting MAY include:
- proposal state;
- analysis completeness;
- review completeness;
- unresolved findings;
- dissent;
- migration readiness;
- tenant readiness;
- Extension readiness;
- Publication readiness;
- risk;
- schedule;
- provenance.
A dashboard SHALL remain a projection, not the authoritative Programme Registry.
26.25.18. Programme Suspension
A programme MAY be suspended due to:
- authority loss;
- source-authority change;
- unresolved invariant conflict;
- insufficient evidence;
- security incident;
- incompatible dependency;
- material scope change;
- failed review;
- invalid baseline assumption.
26.25.19. Programme Closure
Closure SHALL require:
- proposal outcomes recorded;
- Baseline Release or rejection recorded;
- migration obligations assigned;
- transition status recorded;
- open findings transferred or resolved;
- archival complete;
- provenance complete.
26.25.20. Programme Registry
The Programme Registry SHALL preserve:
- identities;
- Charters;
- proposals;
- Change Sets;
- stage states;
- dependencies;
- risks;
- decisions;
- outcomes;
- closure;
- provenance.
26.25.21. Programme Validation
HECATE SHALL validate:
- Programme identity;
- Charter;
- source and target baselines;
- included proposals;
- scope;
- dependencies;
- stage Gates;
- authority;
- closure;
- provenance.
HECATE SHALL not prioritise or approve constitutional policy objectives.
26.26. Constitutional Review Plan and Evidence Architecture
Every material Constitutional Change Proposal SHALL possess a review plan proportionate to its Change Classes, severity, impact radius and Protected-Invariant exposure.
The review plan SHALL determine which analyses, reviewers, evidence classes, independence controls and completion criteria apply.
26.26.1. Constitutional Review Plan Identity
Every Review Plan SHALL possess:
- Review Plan Identifier;
- Constitutional Change Proposal;
- candidate version;
- source baseline;
- Change Classes;
- severity;
- required review domains;
- required reviewers;
- independence rules;
- evidence requirements;
- review sequence;
- completion criteria;
- escalation;
- lifecycle;
- version;
- provenance.
26.26.2. Review Domains
Review Domains MAY include:
- Constitutional Architecture Review;
- Semantic Review;
- Identity and Namespace Review;
- Structural Review;
- Data and Graph Review;
- Policy and Decision Review;
- Methodology and Computation Review;
- Workflow and Event Review;
- Agent and Tool Review;
- Module and Component Review;
- Extension Ecosystem Review;
- Legal Review;
- Regulatory Review;
- Security Review;
- Privacy Review;
- Tenant-Isolation Review;
- Publication Review;
- Assurance Review;
- Migration Review;
- Runtime and Reliability Review;
- Historical-Trust Review;
- Accessibility and Public-Interest Review.
26.26.3. Review Requirement Resolution
Review requirements SHALL be resolved from:
- Change Classes;
- Protected Invariants;
- affected artefacts;
- affected jurisdictions;
- affected Modules and Components;
- affected Extensions;
- tenant population;
- Publication exposure;
- security classification;
- historical impact.
26.26.4. Mandatory Review
Mandatory review SHALL not be waived by a programme owner without explicit authority.
26.26.5. Review Independence
Independence MAY require:
- reviewer outside the implementing Component;
- reviewer outside the owning Module;
- reviewer without commercial interest;
- reviewer not involved in proposal authorship;
- independent assurance provider;
- external domain expert;
- tenant or public-interest representative.
26.26.6. Reviewer Competence
A reviewer SHALL possess competence appropriate to:
- constitutional subject;
- jurisdiction;
- framework;
- methodology;
- security domain;
- Runtime architecture;
- tenant context;
- Publication context;
- assurance criteria.
26.26.7. Reviewer Assignment
Assignment SHALL preserve:
- reviewer identity;
- Role;
- competence basis;
- scope;
- independence;
- conflict-of-interest status;
- due time;
- provenance.
26.26.8. Review Deliverable
A review deliverable SHALL identify:
- proposal version;
- reviewed artefacts;
- criteria;
- evidence;
- findings;
- unresolved questions;
- recommendation;
- limitations;
- reviewer;
- time;
- provenance.
26.26.9. Review Outcome
Review Outcome MAY be:
- Satisfactory;
- Satisfactory with Conditions;
- Revision Required;
- Additional Evidence Required;
- Escalation Required;
- Not Applicable;
- Unable to Conclude;
- Unsatisfactory.
Unable to Conclude SHALL not be treated as Satisfactory.
26.26.10. Evidence Plan
An Evidence Plan SHALL define:
- evidence questions;
- required evidence types;
- evidence sources;
- authority;
- collection method;
- confidentiality;
- quality criteria;
- retention;
- review;
- provenance.
26.26.11. Evidence Object
Every material Evidence Object SHALL possess:
- Evidence Identifier;
- evidence type;
- source;
- source authority;
- subject;
- relevant proposal;
- acquisition time;
- effective time;
- integrity;
- classification;
- reliability;
- limitations;
- chain of custody;
- lifecycle;
- provenance.
26.26.12. Evidence Types
Evidence Types MAY include:
- constitutional source;
- legal source;
- regulatory source;
- framework source;
- scientific source;
- methodology source;
- technical specification;
- operational telemetry;
- incident record;
- audit finding;
- assurance report;
- tenant evidence;
- Extension evidence;
- Publication evidence;
- compatibility test;
- migration simulation;
- replay evidence;
- expert opinion;
- public consultation submission.
26.26.13. Evidence Authority
Evidence authority SHALL distinguish:
- legally binding authority;
- regulatory guidance;
- normative standard;
- accepted methodology;
- internal constitutional source;
- operational observation;
- expert opinion;
- stakeholder assertion;
- derived intelligence;
- AI-generated analysis.
26.26.14. AI-Generated Evidence Support
AI MAY assist with:
- document comparison;
- semantic diff;
- dependency discovery;
- impact hypothesis;
- scenario generation;
- issue clustering;
- evidence summarisation;
- contradiction detection.
AI output SHALL remain a derived analytical artefact until reviewed and accepted.
26.26.15. Evidence Quality
Evidence quality SHALL consider:
- authority;
- relevance;
- recency;
- completeness;
- independence;
- reproducibility;
- integrity;
- uncertainty;
- conflict;
- provenance.
26.26.16. Conflicting Evidence
Conflicting evidence SHALL preserve:
- each source;
- each authority;
- differing claims;
- affected conclusion;
- resolution method;
- unresolved uncertainty;
- provenance.
26.26.17. Evidence Gap
An Evidence Gap SHALL identify:
- unanswered question;
- required evidence;
- reason unavailable;
- materiality;
- uncertainty;
- mitigation;
- ratification effect;
- provenance.
26.26.18. Evidence Threshold
The Review Plan MAY define minimum evidence thresholds for:
- admission;
- deliberation;
- ratification;
- emergency action;
- activation;
- assurance;
- retrospective review.
26.26.19. Evidence Freshness
Evidence SHALL be reassessed where:
- external authority changes;
- regulation changes;
- baseline changes;
- Runtime state changes;
- incident occurs;
- model or methodology changes;
- evidence exceeds its validity period.
26.26.20. Review Question
A Review Question SHALL preserve:
- question identity;
- subject;
- requester;
- reviewer;
- due time;
- response;
- evidence;
- status;
- provenance.
26.26.21. Review Finding
A Review Finding SHALL identify:
- criterion;
- affected proposal or artefact;
- observed state;
- expected state;
- evidence;
- severity;
- materiality;
- remediation;
- owner;
- provenance.
26.26.22. Finding Severity
Severity MAY include:
- Informational;
- Low;
- Moderate;
- High;
- Critical;
- Ratification-Blocking.
26.26.23. Finding Resolution
Resolution SHALL preserve:
- finding;
- proposed remediation;
- changed artefact;
- evidence;
- reviewer verification;
- status;
- time;
- provenance.
26.26.24. Accepted Limitation
A limitation MAY be accepted only where:
- authority exists;
- risk is explicit;
- scope is bounded;
- affected stakeholders are identified;
- monitoring exists;
- expiration or review exists;
- provenance is preserved.
26.26.25. Review Completeness
Review is complete only where:
- required domains are covered;
- assigned reviews are submitted;
- blocking findings are resolved;
- accepted limitations are authorised;
- evidence gaps are treated;
- candidate version matches;
- provenance is complete.
26.26.26. Review Reopening
Review SHALL reopen where:
- normative text changes materially;
- Change Set changes;
- impact analysis changes materially;
- new Protected-Invariant impact appears;
- dependency snapshot changes materially;
- migration changes materially;
- new external authority appears.
26.26.27. Review Package
A Review Package SHOULD contain:
- proposal;
- candidate Amendment;
- Change Set;
- Diffs;
- impact analysis;
- evidence inventory;
- Review Plan;
- findings;
- responses;
- dissent;
- migration;
- conformance plan;
- provenance.
26.26.28. Review Receipt
A Review Receipt SHOULD contain:
- Review Plan;
- proposal version;
- review domain;
- reviewer;
- evidence set;
- outcome;
- findings;
- limitations;
- time;
- provenance.
26.26.29. Review Validation
HECATE SHALL validate:
- Review Plan;
- required domains;
- reviewer assignments;
- independence;
- evidence identity;
- evidence quality metadata;
- findings;
- resolution;
- completeness;
- candidate binding;
- provenance.
26.27. Stakeholder Consultation and Constitutional Deliberation
Constitutional deliberation SHALL provide a governed process for affected stakeholders to understand, question, support, oppose, refine or challenge proposed Core change.
Consultation SHALL inform ratification but SHALL not be represented as ratification unless the constitutional authority model explicitly grants decision rights.
26.27.1. Consultation Plan
Every material consultation SHALL possess:
- Consultation Plan Identifier;
- Constitutional Change Proposal;
- candidate version;
- consultation purpose;
- stakeholder classes;
- participation rights;
- disclosure profile;
- channels;
- languages;
- accessibility;
- confidentiality;
- opening time;
- closing time;
- response process;
- decision-use policy;
- provenance.
26.27.2. Stakeholder Classes
Stakeholder Classes MAY include:
- Core maintainers;
- Module owners;
- Component owners;
- white-label operators;
- tenants;
- organisations;
- framework authorities;
- regulators;
- assurance providers;
- auditors;
- verifier networks;
- data providers;
- methodology providers;
- integration partners;
- public authorities;
- NGOs;
- affected communities;
- public-interest experts;
- investors or financial stakeholders where relevant;
- internal staff;
- external technical experts.
26.27.3. Participation Rights
Rights MAY include:
- notice;
- access to public proposal materials;
- question submission;
- evidence submission;
- comment;
- objection;
- alternative proposal;
- challenge;
- appeal;
- response receipt;
- decision explanation.
26.27.4. Consultation Scope
Consultation scope SHALL identify:
- which proposal content is open;
- which evidence is available;
- which security or confidential material is withheld;
- which questions are in scope;
- which authority will consider responses;
- how responses affect deliberation.
26.27.5. Consultation Disclosure
Disclosure SHALL preserve the distinction between:
- Draft Proposal;
- Candidate Amendment;
- ratification-ready candidate;
- ratified Amendment;
- active Baseline.
A proposal SHALL not be presented as active Core.
26.27.6. Consultation Channel
Channels MAY include:
- governed portal;
- documented meeting;
- hearing;
- technical workshop;
- tenant advisory forum;
- regulator engagement;
- written submission;
- structured survey;
- public consultation Publication.
26.27.7. Accessibility and Language
Consultation SHOULD support:
- relevant languages;
- accessible formats;
- machine-readable material;
- human-readable summaries;
- clear deadlines;
- assistance for complex technical submissions.
Translations SHALL preserve source meaning and version lineage.
26.27.8. Consultation Submission
Every material submission SHALL possess:
- Submission Identifier;
- submitter;
- represented stakeholder;
- proposal version;
- submission type;
- content;
- evidence;
- confidentiality request;
- conflict-of-interest disclosure;
- time;
- provenance.
26.27.9. Submission Types
Types MAY include:
- Support;
- Conditional Support;
- Objection;
- Technical Comment;
- Legal Comment;
- Security Comment;
- Tenant-Impact Comment;
- Extension-Impact Comment;
- Publication Comment;
- Evidence Submission;
- Alternative Proposal;
- Challenge;
- Request for Clarification.
26.27.10. Anonymous or Protected Submission
Anonymous or protected submissions MAY be permitted where:
- retaliation risk exists;
- public-interest evidence is material;
- authority can validate legitimacy;
- confidentiality controls exist.
The limitation on verification SHALL be recorded.
26.27.11. Submission Triage
Triage SHALL classify:
- relevance;
- materiality;
- duplication;
- evidence content;
- confidentiality;
- affected review domain;
- required response;
- provenance.
26.27.12. Duplicate Submission
Duplicate or substantially similar submissions MAY be grouped for analysis.
Individual provenance SHALL remain preserved where required.
26.27.13. Consultation Analysis
Analysis MAY identify:
- support distribution;
- recurring concerns;
- stakeholder-specific impacts;
- unresolved questions;
- evidence gaps;
- alternatives;
- geographic or tenant concentration;
- conflicts;
- provenance.
Quantitative popularity SHALL not substitute for constitutional reasoning.
26.27.14. Consultation Response
A response SHALL identify:
- submission;
- issue;
- consideration;
- evidence used;
- resulting change or reason for no change;
- authority;
- provenance.
26.27.15. Deliberation Session
Every material Deliberation Session SHALL preserve:
- Session Identifier;
- proposal version;
- participants;
- Roles;
- authority;
- agenda;
- evidence considered;
- questions;
- arguments;
- alternatives;
- decisions;
- unresolved issues;
- time;
- provenance.
26.27.16. Deliberation Principles
Deliberation SHOULD support:
- reasoned argument;
- equal treatment of relevant evidence;
- conflict disclosure;
- separation of facts and preferences;
- explicit uncertainty;
- alternative evaluation;
- minority opinion;
- traceable revisions.
26.27.17. Deliberation Question
A material question SHALL identify:
- question;
- proposer;
- affected artefact;
- evidence;
- response;
- resolution;
- unresolved state;
- provenance.
26.27.18. Constitutional Alternative
An Alternative SHALL possess:
- Alternative Identifier;
- source proposal;
- proposed difference;
- rationale;
- affected invariants;
- impact;
- compatibility;
- migration;
- support;
- provenance.
26.27.19. Alternative Comparison
Comparison SHOULD evaluate:
- constitutional coherence;
- legal compliance;
- security;
- tenant impact;
- Extension impact;
- Runtime feasibility;
- Publication impact;
- migration cost;
- reversibility;
- historical trust.
26.27.20. Dissent Record
A Dissent Record SHALL preserve:
- dissenting party;
- Role;
- proposal version;
- objection;
- evidence;
- affected invariant;
- predicted consequence;
- alternative;
- requested remedy;
- time;
- provenance.
26.27.21. Minority Opinion
A material Minority Opinion SHOULD be preserved with the ratification record.
It MAY include:
- legal dissent;
- technical dissent;
- security dissent;
- tenant dissent;
- public-interest dissent;
- methodological dissent.
26.27.22. Constitutional Challenge
A Challenge SHALL identify:
- challenged proposal or procedure;
- challenger;
- standing or participation basis;
- grounds;
- evidence;
- requested action;
- urgency;
- lifecycle;
- provenance.
26.27.23. Challenge Grounds
Grounds MAY include:
- invalid authority;
- inadequate consultation;
- incomplete evidence;
- invariant violation;
- hidden semantic change;
- incomplete tenant impact;
- incomplete Extension impact;
- conflict of interest;
- invalid quorum;
- incorrect classification;
- procedural defect;
- misleading Publication.
26.27.24. Challenge Outcome
Outcome MAY be:
- Upheld;
- Partially Upheld;
- Rejected;
- Revision Required;
- Additional Review Required;
- Ratification Hold;
- Release Hold;
- Activation Hold;
- Referred to Appeal;
- Indeterminate.
26.27.25. Deliberation Revision
A material revision SHALL:
- create a new candidate version;
- update Semantic and Constitutional Diffs;
- update impact analysis where required;
- update evidence;
- identify originating submissions or findings;
- reopen review where required;
- preserve provenance.
26.27.26. Consultation Closure
Closure SHALL identify:
- submissions received;
- responses completed;
- unresolved issues;
- proposal changes;
- dissent;
- challenges;
- final candidate version;
- provenance.
26.27.27. Consultation Report
A Consultation Report MAY publish:
- scope;
- stakeholder classes;
- submissions summary;
- issues;
- responses;
- changes;
- dissent;
- limitations;
- provenance reference.
It SHALL comply with the CPF.
26.27.28. Deliberation Receipt
A receipt SHOULD contain:
- proposal;
- candidate version;
- session or consultation;
- participants;
- evidence;
- alternatives;
- unresolved issues;
- resulting action;
- time;
- provenance.
26.27.29. Consultation and Deliberation Validation
HECATE SHALL validate:
- Consultation Plan;
- proposal version;
- stakeholder classes;
- participation rights;
- submission identity;
- response completeness;
- dissent;
- challenge;
- revision binding;
- closure;
- provenance.
26.28. Ratification Procedure and Constitutional Decision Runtime
Ratification is the constitutional act through which an exact Candidate Amendment is accepted or rejected as authoritative Core meaning.
Ratification SHALL be performed only by valid Ratification Authority under the applicable procedure.
26.28.1. Ratification Procedure
Every ratification SHALL possess a Ratification Procedure defining:
- Procedure Identifier;
- applicable Change Classes;
- eligible Ratification Authorities;
- quorum;
- threshold;
- reserved authority;
- voting or approval method;
- recusal;
- abstention;
- veto where applicable;
- emergency treatment;
- challenge treatment;
- signature requirements;
- provenance.
26.28.2. Ratification Request
Every Ratification Request SHALL possess:
- Ratification Request Identifier;
- Constitutional Change Proposal;
- Candidate Amendment;
- Constitutional Change Set;
- Amendment Package;
- candidate target Baseline;
- Review Freeze digest;
- Review Completion Record;
- Impact Analysis;
- Migration and Transition Plans;
- requested decision time;
- requester;
- authority;
- provenance.
26.28.3. Ratification Readiness Gate
The Gate SHALL evaluate:
- proposal admission;
- candidate identity;
- source baseline;
- Change Classes;
- Protected-Invariant treatment;
- required reviews;
- evidence;
- unresolved findings;
- dissent;
- challenges;
- compatibility;
- migration;
- conformance plan;
- exact digests;
- authority;
- provenance.
26.28.4. Ratification Eligibility
A participant is eligible only where:
- Role is valid;
- authority is active;
- scope includes the proposal;
- Change Class is permitted;
- conflict-of-interest treatment is complete;
- delegation is valid;
- no suspension applies.
26.28.5. Quorum Calculation
Quorum SHALL preserve:
- eligible participant set;
- present participants;
- recusals;
- abstentions;
- required domain representation;
- threshold basis;
- result;
- provenance.
26.28.6. Ratification Methods
Methods MAY include:
- unanimous approval;
- supermajority;
- qualified majority;
- multi-role concurrence;
- sequential authority approval;
- reserved-authority approval;
- board or committee decision;
- signed institutional decision;
- emergency authority decision.
The method SHALL be constitutionally defined.
26.28.7. Vote or Approval Object
Every material vote or approval SHALL possess:
- Decision Contribution Identifier;
- participant;
- Role;
- authority;
- candidate digest;
- position;
- conditions;
- rationale where required;
- time;
- signature;
- provenance.
26.28.8. Decision Contribution Classes
Classes MAY include:
- Approve;
- Approve with Condition;
- Reject;
- Abstain;
- Recuse;
- Defer;
- Unable to Conclude.
26.28.9. Abstention
Abstention treatment SHALL be defined for:
- quorum;
- threshold denominator;
- minority opinion;
- conflict avoidance;
- emergency procedure.
26.28.10. Recusal
Recusal SHALL identify:
- participant;
- conflict or reason;
- affected decision;
- replacement where applicable;
- quorum effect;
- provenance.
26.28.11. Veto or Reserved Power
A veto or reserved power SHALL identify:
- holder;
- subject;
- Change Classes;
- conditions;
- exercise;
- rationale;
- appeal or override if permitted;
- provenance.
26.28.12. Ratification Outcome
Outcome classes MAY include:
- Ratified;
- Ratified with Conditions;
- Ratified for Transitional Baseline;
- Ratified for Limited Scope;
- Ratified as Emergency Amendment;
- Revision Required;
- Deferred;
- Rejected;
- Withdrawn;
- Procedurally Invalid;
- Indeterminate.
26.28.13. Conditional Ratification
Every condition SHALL identify:
- condition;
- responsible owner;
- completion criteria;
- deadline;
- verification authority;
- effect on release;
- effect on activation;
- failure consequence;
- provenance.
26.28.14. Limited-Scope Ratification
Limited scope MAY be defined by:
- jurisdiction;
- transition cohort;
- Runtime generation;
- white-label deployment;
- tenant class;
- time;
- emergency domain.
The limitation SHALL not create ambiguous Core identity.
26.28.15. Procedurally Invalid Decision
A decision SHALL be invalid where material requirements fail, including:
- invalid authority;
- missing quorum;
- wrong candidate digest;
- unresolved mandatory hold;
- undisclosed disqualifying conflict;
- altered Package;
- invalid signature;
- prohibited Change Class.
26.28.16. Ratification Record
The Ratification Record SHALL contain:
- Ratification Decision Identifier;
- Request;
- Procedure;
- candidate digest;
- source and target baselines;
- eligible participants;
- quorum;
- contributions;
- conditions;
- dissent;
- challenges;
- outcome;
- effective-time instruction;
- signatures;
- provenance.
26.28.17. Ratification Signature Set
The Signature Set SHALL bind:
- Ratification Record digest;
- Amendment Package digest;
- Constitutional Change Set digest;
- target Baseline Manifest digest;
- signers;
- authority;
- signing times;
- key states;
- provenance.
26.28.18. Ratification Explanation
The system SHALL provide a human-readable explanation of:
- what was decided;
- which candidate was decided;
- applicable authority;
- quorum and threshold;
- conditions;
- dissent;
- effective-time instruction;
- provenance.
26.28.19. Ratification Notification
Notification MAY be sent to:
- programme owner;
- proposers;
- reviewers;
- white-label operators;
- affected tenants;
- Extension publishers;
- assurance providers;
- regulators;
- public audiences where authorised.
External notification SHALL comply with the CPF.
26.28.20. Ratification Appeal
Appeal SHALL preserve:
- appealed decision;
- appellant;
- grounds;
- evidence;
- appeal authority;
- stay or hold;
- decision;
- remedy;
- provenance.
26.28.21. Ratification Stay
A stay MAY prevent:
- Baseline Release;
- compilation;
- migration;
- activation;
- public representation as active Core.
The stay SHALL not erase the Ratification Record.
26.28.22. Decision Finality
Finality SHALL identify:
- whether appeal remains available;
- appeal deadline;
- conditions outstanding;
- release eligibility;
- activation eligibility;
- provenance.
26.28.23. Ratification Registry
The Ratification Registry SHALL preserve:
- procedures;
- requests;
- contributions;
- decisions;
- conditions;
- signatures;
- appeals;
- stays;
- finality;
- provenance.
26.28.24. Ratification Runtime Receipt
A receipt SHOULD contain:
- Request;
- candidate digest;
- authority;
- quorum;
- threshold;
- outcome;
- conditions;
- signatures;
- time;
- provenance.
26.28.25. Ratification Validation
HECATE SHALL validate:
- Procedure;
- Request;
- readiness;
- eligibility;
- quorum;
- threshold;
- candidate binding;
- conditions;
- signatures;
- appeal or stay;
- finality;
- provenance.
HECATE SHALL not cast a vote, exercise discretion or create ratification authority.
26.29. Constitutional Baseline Release Assembly and Publication
A Constitutional Baseline Release is the integrity-protected publication of a ratified constitutional state for compilation, migration, activation, historical reference and authorised public verification.
Ratification and release SHALL remain distinct.
Release assembly SHALL reproduce ratified meaning exactly.
26.29.1. Baseline Release Identity
Every Constitutional Baseline Release SHALL possess:
- Baseline Release Identifier;
- Constitutional Baseline Identifier;
- release version;
- source Baseline;
- included Ratification Decisions;
- included Amendment Packages;
- included Constitutional Change Sets;
- Baseline Manifest;
- release authority;
- issue time;
- effective-time instruction;
- compatibility;
- lifecycle;
- content digest;
- signatures;
- provenance.
26.29.2. Release Classes
Release Classes MAY include:
- General Availability Baseline Release;
- Long-Term Support Baseline Release;
- Regulatory Transition Release;
- Corrective Baseline Release;
- Emergency Baseline Release;
- Limited-Scope Baseline Release;
- Historical Consolidation Release.
26.29.3. Release Assembly Plan
A Release Assembly Plan SHALL identify:
- ratified Amendment Packages;
- target Baseline;
- source repositories;
- source commits;
- canonical artefact sources;
- assembly Component;
- compiler-independent normalization;
- Manifest generation;
- integrity controls;
- signature requirements;
- Publication requirements;
- provenance.
26.29.4. Release Artefact Inventory
The release inventory SHALL identify:
- constitutional documents;
- Core Object Types;
- Core properties;
- datatypes;
- units;
- Value Providers;
- Registries;
- Relationship Types;
- graph constraints;
- policies;
- decisions;
- methodologies;
- workflows;
- events;
- commands;
- Agent Profiles;
- tool contracts;
- Module definitions;
- Component obligations;
- Extension Points;
- Runtime contracts;
- Publication contracts;
- conformance profiles;
- migration declarations;
- Protected Invariants.
26.29.5. Normative Source Binding
Each normative artefact SHALL bind to:
- canonical identity;
- source file or content location;
- version;
- digest;
- authority;
- Ratification Decision;
- effective time;
- provenance.
26.29.6. Release Assembly Determinism
Equivalent ratified inputs and assembly profile SHOULD produce semantically equivalent Baseline Releases.
Byte-for-byte reproducibility SHOULD be required where the release profile supports it.
26.29.7. Ratification Fidelity
Release assembly SHALL NOT:
- add unratified requirements;
- omit ratified requirements;
- weaken conditions;
- reinterpret ambiguity;
- remove dissent;
- change effective-time instruction;
- alter migration obligations;
- alter Module or Component lineage;
- alter Extension compatibility outcomes.
26.29.8. Release Assembly Finding
A finding SHALL identify:
- ratified source;
- assembled artefact;
- observed difference;
- expected state;
- severity;
- materiality;
- remediation;
- provenance.
A material fidelity finding SHALL block release.
26.29.9. Baseline Manifest
The Baseline Manifest SHALL identify:
- Baseline identity;
- release version;
- artefact inventory;
- artefact digests;
- constitutional hierarchy;
- Amendment Package inventory;
- Change Set inventory;
- Protected Invariant inventory;
- source Baseline;
- target Baseline;
- compatibility;
- migration obligations;
- transition profile;
- conformance profile;
- signatures;
- provenance.
26.29.10. Baseline Root Digest
The release SHOULD possess an artefact-root digest binding all normative artefacts and the Baseline Manifest.
26.29.11. Release Signature
A Release Signature SHALL bind:
- Baseline Release Identifier;
- Baseline Manifest digest;
- artefact-root digest;
- Ratification Record digests;
- signer;
- release authority;
- signing time;
- key;
- revocation state;
- provenance.
26.29.12. Multiple Release Signatures
A release MAY require signatures from:
- Ratification Authority;
- Baseline Release Authority;
- Constitutional Custodian;
- Security Authority;
- Archive Authority;
- independent assurance provider.
Each signature SHALL state its scope.
26.29.13. Release Candidate
A Constitutional Release Candidate is assembled but not yet released.
It SHALL be clearly distinguished from:
- Candidate Amendment;
- ratified Amendment;
- Baseline Release;
- active Baseline.
26.29.14. Release Freeze
Release Freeze SHALL bind:
- Release Candidate;
- Baseline Manifest;
- artefact-root digest;
- release notes;
- compatibility matrix;
- migration references;
- signatures pending.
A material change SHALL invalidate the freeze.
26.29.15. Release Readiness Gate
The Gate SHALL evaluate:
- ratification finality;
- conditions completed or properly deferred;
- fidelity;
- Manifest completeness;
- signatures;
- compatibility;
- migration readiness classification;
- Extension impact records;
- Publication materials;
- archive readiness;
- provenance.
26.29.16. Release Notes
Release Notes SHOULD identify:
- source and target Baselines;
- included Amendments;
- changed Core artefacts;
- compatibility;
- affected Extension Points;
- affected Modules and Components;
- tenant and white-label impact;
- migration;
- transition dates;
- Publication impact;
- assurance impact;
- known limitations;
- provenance reference.
26.29.17. Machine-Readable Release
The release SHOULD provide machine-readable artefacts sufficient for:
- compiler ingestion;
- Runtime Admission;
- compatibility resolution;
- migration planning;
- Extension revalidation;
- conformance testing;
- historical reconstruction.
26.29.18. Human-Readable Release
The release SHALL provide human-readable normative content and explanation sufficient for review and governance.
26.29.19. Public Constitutional Publication
A public constitutional release MAY expose:
- Baseline identity;
- status;
- effective time;
- release notes;
- normative public artefacts;
- public compatibility summary;
- public migration summary;
- verification reference;
- dissent summary where authorised.
It SHALL comply with the CPF.
26.29.20. Restricted Release Material
Restricted material MAY include:
- security-sensitive controls;
- confidential legal analysis;
- protected tenant information;
- internal operational details;
- key material;
- sensitive incident evidence.
Restriction SHALL not prevent authorised verification.
26.29.21. Release Distribution
Distribution SHALL preserve:
- release identity;
- Manifest;
- digests;
- signatures;
- trust roots;
- revocation state;
- recipient;
- time;
- provenance.
26.29.22. Release Registry
The Baseline Release Registry SHALL preserve:
- Releases;
- Candidates;
- Manifests;
- digests;
- signatures;
- lifecycle;
- effective times;
- transition profiles;
- supersession;
- withdrawal;
- provenance.
26.29.23. Release Withdrawal
A released Baseline MAY be withdrawn before activation where:
- Ratification is invalidated;
- integrity fails;
- critical defect exists;
- signing key is compromised;
- source authority changes;
- legal prohibition applies.
Withdrawal SHALL preserve the historical Release.
26.29.24. Released-Baseline Correction
A released but inactive Baseline with a defect SHALL be corrected through:
- corrected Release where meaning is unchanged and governance permits; or
- Corrective Amendment where meaning changes.
The original Release SHALL remain preserved.
26.29.25. Release Receipt
A Release Receipt SHOULD contain:
- Baseline Release;
- Manifest digest;
- artefact-root digest;
- Ratification Records;
- signatures;
- issue time;
- effective-time instruction;
- status;
- provenance.
26.29.26. Release Validation
HECATE SHALL validate:
- Release identity;
- ratification fidelity;
- artefact inventory;
- Manifest;
- digests;
- signatures;
- release readiness;
- public and restricted projections;
- Registry state;
- provenance.
HECATE SHALL not alter ratified meaning during validation.
26.30. Constitutional Transition Programme
A Constitutional Transition Programme coordinates movement from a source Constitutional Baseline to a target Constitutional Baseline across Runtime Bundles, Extensions, tenants, white-label deployments, Modules, Components, data, graph, workflows, Publications and archives.
Transition SHALL be governed independently from ratification.
26.30.1. Transition Programme Identity
Every Transition Programme SHALL possess:
- Transition Programme Identifier;
- source Baseline;
- target Baseline Release;
- target effective time;
- programme owner;
- Transition Authority;
- Transition Profile;
- Migration Obligation inventory;
- affected Runtime Bundles;
- affected Modules and Components;
- affected Extension Packages;
- affected tenants and white-label deployments;
- affected Publications;
- wave plan;
- monitoring plan;
- rollback or corrective plan;
- lifecycle;
- provenance.
26.30.2. Transition Programme Types
Types MAY include:
- Platform-Wide Transition;
- Jurisdictional Transition;
- Regulatory Transition;
- White-Label Transition;
- Tenant-Cohort Transition;
- Runtime-Generation Transition;
- Long-Term Support Transition;
- Security Transition;
- Emergency Transition;
- Corrective Transition.
26.30.3. Transition Charter
The Charter SHALL define:
- constitutional objective;
- source and target states;
- scope;
- excluded scope;
- compatibility assumptions;
- grandfathering;
- migration;
- coexistence;
- effective time;
- enforcement;
- support;
- risk;
- success criteria;
- failure criteria;
- provenance.
26.30.4. Transition Authority
Transition Authority SHALL identify who may:
- schedule;
- start;
- pause;
- resume;
- change waves;
- approve exceptions;
- approve cutover;
- trigger rollback;
- close transition.
Transition Authority SHALL not change ratified meaning.
26.30.5. Transition Inventory
The inventory SHALL identify:
- Runtime environments;
- tenants;
- white-label deployments;
- Modules;
- Components;
- Extension Sets;
- Packages;
- data stores;
- graph stores;
- event streams;
- workflows;
- agents;
- models;
- tools;
- Connectors;
- Publications;
- archives;
- assurance engagements;
- certifications.
26.30.6. Transition Segmentation
Segmentation MAY be by:
- jurisdiction;
- white-label operator;
- tenant;
- organisation;
- environment;
- Runtime generation;
- Module;
- Component;
- Extension compatibility;
- data volume;
- risk;
- regulatory deadline.
26.30.7. Transition Wave
Every Transition Wave SHALL possess:
- Wave Identifier;
- included scopes;
- source state;
- target state;
- prerequisites;
- start time;
- completion target;
- migration obligations;
- activation plan;
- success criteria;
- failure criteria;
- rollback;
- owner;
- provenance.
26.30.8. Wave Sequencing
Sequencing SHALL consider:
- dependency critical paths;
- shared Components;
- Extension compatibility;
- tenant readiness;
- regulator deadlines;
- publication cycles;
- assurance engagements;
- support capacity;
- rollback feasibility.
26.30.9. Pilot Wave
A Pilot Wave SHOULD include representative but controlled scopes sufficient to validate:
- migration;
- compatibility;
- tenant isolation;
- Runtime Admission;
- Publication impact;
- support;
- monitoring;
- rollback.
26.30.10. Canary Transition
Canary transition MAY use a small production cohort with:
- explicit authority;
- heightened monitoring;
- narrow scope;
- success criteria;
- automatic or manual stop criteria;
- rollback readiness;
- provenance.
26.30.11. Shadow Transition
Shadow transition MAY evaluate target-baseline outcomes without authoritative side effects.
It SHALL label outputs as non-authoritative comparison results.
26.30.12. Dual-Baseline Operation
Dual-Baseline Operation SHALL define:
- source and target Baseline scopes;
- authoritative baseline for each context;
- routing;
- data interpretation;
- Extension resolution;
- Runtime Bundle mapping;
- Publication interpretation;
- end condition;
- provenance.
26.30.13. Baseline Routing
Routing SHALL use explicit context including:
- tenant;
- white-label deployment;
- jurisdiction;
- environment;
- effective time;
- transition cohort;
- Runtime Bundle;
- provenance.
Implicit routing by deployment accident SHALL be prohibited.
26.30.14. Transition Dependency Lock
Each wave SHOULD preserve exact:
- source Baseline;
- target Baseline;
- Runtime Bundles;
- Extension Packages;
- Module versions;
- Component versions;
- migration artefacts;
- configuration;
- provenance.
26.30.15. Tenant Readiness
Tenant Readiness SHALL evaluate:
- contractual notice;
- legal applicability;
- data quality;
- active workflows;
- Extensions;
- integrations;
- Publications;
- assurance;
- support contacts;
- migration readiness;
- rollback feasibility.
26.30.16. White-Label Readiness
White-label readiness SHALL evaluate:
- operator approval;
- tenant population;
- operator Extensions;
- shared Components;
- public branding;
- public domains;
- support;
- integrations;
- communication;
- provenance.
26.30.17. Module Readiness
Module Readiness SHALL evaluate:
- constitutional responsibility;
- Component support;
- contracts;
- data ownership;
- event ownership;
- workflows;
- observability;
- rollback;
- provenance.
26.30.18. Component Readiness
Component Readiness SHALL evaluate:
- supported Baseline;
- supported Runtime Bundle;
- capability contracts;
- authority;
- security;
- state migration;
- deployment;
- health;
- conformance;
- provenance.
26.30.19. Extension Readiness
Extension Readiness SHALL evaluate:
- Extension-Point compatibility;
- recompile;
- revalidation;
- repackage;
- tenant adoption;
- target activation;
- migration;
- support;
- provenance.
26.30.20. Publication Readiness
Publication Readiness SHALL evaluate:
- active reporting periods;
- Publication preparation;
- assurance;
- public schemas;
- public APIs;
- datasets;
- passports;
- correction or restatement exposure;
- communication;
- provenance.
26.30.21. Transition Exception
An exception SHALL identify:
- affected scope;
- reason;
- authority;
- source Baseline retention;
- security;
- support limitations;
- migration deadline;
- Publication treatment;
- expiration;
- provenance.
26.30.22. Transition Hold
A hold MAY be triggered by:
- failed migration;
- Extension incompatibility;
- tenant-isolation finding;
- security incident;
- Publication defect;
- invalid Runtime Bundle;
- support overload;
- regulator instruction;
- appeal or challenge.
26.30.23. Transition Communication Plan
The plan SHALL identify:
- audiences;
- messages;
- channels;
- languages;
- timing;
- support;
- escalation;
- public versus restricted content;
- provenance.
26.30.24. Transition Support Model
Support SHALL define:
- accountable owners;
- Module support;
- Component support;
- tenant support;
- white-label support;
- incident path;
- migration assistance;
- knowledge base;
- operating hours;
- provenance.
26.30.25. Transition Risk Register
Risks SHOULD include:
- semantic divergence;
- wrong Baseline routing;
- migration loss;
- Extension failure;
- cross-tenant leakage;
- workflow interruption;
- event incompatibility;
- agent behaviour change;
- Publication inconsistency;
- assurance invalidation;
- rollback failure;
- historical-replay loss.
26.30.26. Transition Success
Success SHALL require:
- target Baseline applied to intended scopes;
- migrations complete;
- Extension state valid;
- Runtime Manifests accurate;
- no blocking drift;
- tenant isolation confirmed;
- Publications treated;
- support transitioned;
- provenance complete.
26.30.27. Transition Closure
Closure SHALL identify:
- completed waves;
- remaining exceptions;
- source Baseline state;
- target Baseline state;
- residual risks;
- archive state;
- retrospective review;
- provenance.
26.30.28. Transition Registry
The Transition Registry SHALL preserve:
- programmes;
- waves;
- scopes;
- dependencies;
- readiness;
- exceptions;
- holds;
- outcomes;
- closure;
- provenance.
26.30.29. Transition Receipt
A receipt SHOULD contain:
- Transition Programme;
- source and target Baselines;
- wave;
- scope;
- readiness;
- migrations;
- activation state;
- findings;
- outcome;
- authority;
- provenance.
26.30.30. Transition Validation
HECATE SHALL validate:
- Programme identity;
- Charter;
- inventory;
- segmentation;
- waves;
- readiness;
- exceptions;
- holds;
- communication;
- closure;
- provenance.
26.31. Runtime Admission, Baseline Activation and Controlled Rollout
A released Constitutional Baseline becomes operational only through governed Runtime Admission and Baseline Activation.
Activation SHALL bind the target Baseline to exact Runtime Bundles, Runtime Manifests, Extension Sets, Modules, Components, tenant scopes and effective times.
26.31.1. Baseline Activation Request
Every Activation Request SHALL possess:
- Activation Request Identifier;
- target Baseline Release;
- Baseline Manifest digest;
- source active Baseline;
- target Runtime Bundle;
- target Runtime Profile;
- target scopes;
- target effective time;
- Transition Programme;
- migration state;
- rollout plan;
- rollback or corrective plan;
- requester;
- Activation Authority;
- provenance.
26.31.2. Runtime Admission Request
A Runtime Admission Request SHALL identify:
- Baseline Release;
- Runtime Bundle;
- compiler build;
- Extension Set;
- Modules;
- Components;
- environment;
- tenant or cohort;
- jurisdiction;
- effective time;
- provenance.
26.31.3. Runtime Admission Checks
Runtime Admission SHALL evaluate:
- Baseline ratification;
- Release integrity;
- signatures;
- revocation;
- compiler provenance;
- Runtime Bundle integrity;
- conformance;
- migration readiness;
- Extension compatibility;
- Module and Component support;
- tenant isolation;
- security;
- Publication readiness;
- rollback;
- provenance.
26.31.4. Runtime Admission Outcome
Outcome MAY be:
- Admitted;
- Admitted with Conditions;
- Admitted for Shadow Execution;
- Admitted for Canary Scope;
- Migration Required;
- Revalidation Required;
- Rejected;
- Suspended;
- Indeterminate.
26.31.5. Activation Plan
The Activation Plan SHALL define:
- target scopes;
- Baseline routing;
- deployment changes;
- Runtime Bundle changes;
- Runtime Manifest changes;
- migration sequence;
- Extension changes;
- cache and projection treatment;
- rollout phases;
- health checks;
- success criteria;
- failure criteria;
- rollback;
- communication;
- provenance.
26.31.6. Activation Preconditions
Preconditions SHALL include as applicable:
- final Ratification Decision;
- released Baseline;
- valid signatures;
- no active stay;
- Runtime Admission;
- required migrations complete;
- tenant and white-label readiness;
- Extension readiness;
- Publication readiness;
- monitoring active;
- rollback ready;
- authority valid.
26.31.7. Activation Gate
The Gate SHALL produce:
- pass;
- pass with conditions;
- hold;
- fail;
- escalation required;
- indeterminate.
Indeterminate SHALL not be treated as pass.
26.31.8. Activation States
Activation State MAY include:
- Requested;
- Validating;
- Admitted;
- Scheduled;
- Deploying;
- Migrating;
- Shadow;
- Canary;
- Partially Active;
- Active;
- Active with Conditions;
- Held;
- Suspended;
- Failed;
- Rolled Back;
- Superseded;
- Deactivated.
26.31.9. Effective Time
The Runtime SHALL distinguish:
- ratification time;
- release time;
- deployment time;
- activation time;
- legal effective time;
- enforcement time;
- transition deadline.
26.31.10. Scheduled Activation
Scheduled activation SHALL use a governed Clock Source and SHALL revalidate material preconditions immediately before activation.
26.31.11. Shadow Activation
Shadow activation SHALL:
- use the target Baseline;
- prohibit authoritative side effects;
- preserve source-baseline authority;
- compare outcomes;
- label results;
- preserve tenant isolation;
- define retention;
- preserve provenance.
26.31.12. Canary Activation
Canary activation SHALL define:
- cohort;
- duration;
- target Baseline;
- source fallback;
- monitoring;
- success criteria;
- failure criteria;
- automatic stop where applicable;
- authority;
- provenance.
26.31.13. Phased Activation
Phases MAY be by:
- environment;
- jurisdiction;
- tenant;
- white-label deployment;
- Module;
- Component;
- Runtime generation;
- capability;
- Publication process.
26.31.14. Partial Activation
Partial activation SHALL preserve:
- active scopes;
- inactive scopes;
- active Baseline per scope;
- Runtime Bundle per scope;
- Extension Set per scope;
- routing;
- transition status;
- provenance.
26.31.15. Runtime Manifest Update
The Runtime Manifest SHALL identify:
- active Constitutional Baseline;
- Baseline Manifest digest;
- Runtime Bundle;
- compiler build;
- Amendment lineage;
- Extension Set;
- Module versions;
- Component versions;
- migration state;
- feature and configuration states;
- tenant routing;
- transition state;
- drift state;
- provenance.
26.31.16. Manifest Consistency
Activation SHALL prevent states where:
- routing points to a Baseline not supported by the Runtime Bundle;
- Extension Sets depend on the wrong Baseline;
- Components implement conflicting Core contracts;
- Module ownership is unresolved;
- migration state is incomplete;
- Publication profiles reference the wrong Baseline;
- Runtime Manifest is stale.
26.31.17. Cache Invalidation
Activation SHALL evaluate:
- constitutional resolution caches;
- policy caches;
- decision caches;
- schema caches;
- graph projections;
- search indexes;
- vector indexes;
- workflow definitions;
- Agent Profiles;
- tool permissions;
- Publication projections.
26.31.18. Projection Rebuild
A projection rebuild SHALL preserve:
- source Baseline;
- target Baseline;
- projection Component;
- scope;
- transformation;
- validation;
- completion;
- provenance.
26.31.19. In-Flight Runtime Work
Activation SHALL define treatment of:
- active API requests;
- queued commands;
- unconsumed events;
- running workflows;
- scheduled Tasks;
- agent sessions;
- tool invocations;
- publication preparation;
- assurance work.
26.31.20. In-Flight Decision Rule
The applicable Baseline for in-flight work SHALL be determined explicitly by:
- start time;
- transaction boundary;
- workflow definition;
- subject state;
- transition policy;
- legal effective time.
26.31.21. Activation Verification
Verification SHALL confirm:
- correct Baseline;
- correct Runtime Bundle;
- correct Runtime Manifest;
- correct Extension Set;
- correct Module and Component versions;
- correct tenant routing;
- successful migrations;
- no material drift;
- health;
- Publication treatment;
- provenance.
26.31.22. Activation Receipt
A Baseline Activation Receipt SHALL contain:
- Activation Request;
- target Baseline;
- Manifest digest;
- Runtime Bundle;
- Runtime Manifest;
- target scope;
- effective time;
- authority;
- migration state;
- rollout phase;
- verification;
- outcome;
- provenance.
26.31.23. Activation Failure
Failure SHALL preserve:
- failed stage;
- source and target Baselines;
- affected scope;
- Runtime Bundle;
- migration state;
- committed changes;
- side effects;
- rollback state;
- incident state;
- provenance.
26.31.24. Rollback
Rollback SHALL define:
- target prior Baseline;
- Runtime Bundle restoration;
- Runtime Manifest restoration;
- reverse migration;
- Extension restoration;
- workflow treatment;
- event treatment;
- Publication treatment;
- external side effects;
- authority;
- provenance.
26.31.25. Corrective Activation
Where rollback is unsafe or legally prohibited, a Corrective Activation MAY deploy a ratified Corrective Baseline.
It SHALL not edit the defective active Baseline in place.
26.31.26. Activation Suspension
Activation MAY be suspended before or during rollout due to:
- stay;
- security finding;
- migration failure;
- tenant-isolation failure;
- Extension incompatibility;
- Publication defect;
- Runtime drift;
- invalid authority;
- revoked release.
26.31.27. Activation Resumption
Resumption SHALL require:
- suspension cause resolved;
- revalidation;
- updated readiness;
- valid authority;
- monitoring;
- provenance.
26.31.28. Activation Registry
The Activation Registry SHALL preserve:
- Requests;
- Admissions;
- Gates;
- plans;
- states;
- Manifests;
- receipts;
- failures;
- rollbacks;
- suspensions;
- provenance.
26.31.29. Activation Validation
HECATE SHALL validate:
- Request;
- Runtime Admission;
- preconditions;
- Gate;
- effective time;
- scope;
- Runtime Manifest;
- verification;
- rollback;
- suspension;
- provenance.
26.32. Post-Activation Monitoring and Corrective Control
A ratified and activated constitutional change SHALL be monitored to determine whether it operates as intended and whether actual consequences remain within the approved constitutional, tenant, Extension, Publication, security and operational boundaries.
Post-activation monitoring SHALL not convert telemetry into constitutional truth without governed interpretation.
26.32.1. Post-Activation Monitoring Plan
Every material amendment SHOULD possess a Monitoring Plan containing:
- Monitoring Plan Identifier;
- target Baseline;
- Amendment lineage;
- monitored scopes;
- objectives;
- indicators;
- thresholds;
- observation period;
- data sources;
- owners;
- escalation;
- corrective triggers;
- retrospective review;
- provenance.
26.32.2. Monitoring Objectives
Objectives MAY include:
- constitutional objective achievement;
- semantic consistency;
- migration correctness;
- policy outcome stability;
- calculation consistency;
- workflow continuity;
- tenant isolation;
- Extension compatibility;
- Runtime health;
- Publication correctness;
- assurance continuity;
- historical replay;
- stakeholder impact.
26.32.3. Constitutional Indicator
A Constitutional Indicator SHOULD identify:
- Indicator Identifier;
- measured constitutional property;
- source;
- method;
- threshold;
- scope;
- frequency;
- owner;
- interpretation;
- limitations;
- provenance.
26.32.4. Indicator Classes
Indicator Classes MAY include:
- Baseline Resolution Accuracy;
- Runtime Manifest Accuracy;
- Semantic Divergence Rate;
- Migration Reconciliation Rate;
- Extension Compatibility Failure Rate;
- Tenant-Isolation Violation Count;
- Policy Outcome Divergence;
- Decision Outcome Divergence;
- Computation Variance;
- Workflow Failure Rate;
- Publication Correction Rate;
- Replay Divergence Rate;
- Constitutional Drift Detection Time;
- Corrective-Action Completion Rate.
26.32.5. Expected Outcome Model
The Monitoring Plan SHOULD define expected:
- constitutional outcomes;
- runtime outcomes;
- tenant outcomes;
- Extension outcomes;
- Publication outcomes;
- security outcomes;
- migration outcomes.
26.32.6. Actual Outcome Record
An Actual Outcome Record SHALL preserve:
- observed subject;
- Baseline;
- Runtime Bundle;
- Module;
- Component;
- tenant;
- time;
- indicator;
- value;
- evidence;
- provenance.
26.32.7. Outcome Divergence
Divergence exists where actual outcomes differ materially from approved expectations.
It SHALL identify:
- expected outcome;
- actual outcome;
- affected scope;
- cause hypothesis;
- severity;
- materiality;
- uncertainty;
- provenance.
26.32.8. Semantic Drift
Semantic Drift MAY include:
- changed interpretation;
- inconsistent labels;
- incompatible outputs;
- altered policy effect;
- altered computation meaning;
- changed Publication narrative;
- divergent Extension use.
26.32.9. Runtime Drift
Runtime Drift MAY include:
- wrong Baseline;
- wrong Runtime Bundle;
- stale Runtime Manifest;
- unapproved Component;
- unapproved model;
- unapproved prompt;
- changed policy;
- changed tool permission;
- unapproved Connector;
- untracked configuration.
26.32.10. Transition Drift
Transition Drift MAY include:
- missed migration deadline;
- prolonged dual-baseline operation;
- unapproved grandfathering;
- unsupported Extension;
- unresolved exception;
- stale compatibility bridge;
- incorrect tenant routing.
26.32.11. Publication Drift
Publication Drift MAY include:
- wrong Baseline label;
- wrong methodology;
- wrong unit;
- missing qualification;
- stale assurance;
- incorrect disclosure;
- wrong public schema;
- absent correction.
26.32.12. Drift Finding
A Drift Finding SHALL identify:
- drift type;
- Baseline;
- affected artefact;
- affected Module and Component;
- affected tenants;
- affected Publications;
- observed state;
- expected state;
- severity;
- remediation;
- provenance.
26.32.13. Monitoring Threshold
A threshold SHALL define:
- metric or condition;
- warning level;
- blocking level;
- observation window;
- affected scope;
- escalation;
- provenance.
26.32.14. Corrective Trigger
Triggers MAY include:
- invariant breach;
- tenant-isolation breach;
- invalid authority;
- repeated semantic divergence;
- migration reconciliation failure;
- critical Extension failure;
- material Publication defect;
- legal non-conformance;
- security compromise;
- historical replay failure.
26.32.15. Corrective Control Classes
Corrective controls MAY include:
- configuration correction;
- implementation correction;
- cache invalidation;
- recompile;
- redeploy;
- revalidation;
- migration remediation;
- Extension suspension;
- Component rollback;
- Baseline rollout hold;
- Publication correction;
- Corrective Amendment;
- emergency suspension.
26.32.16. Implementation Correction
An implementation correction MAY proceed without new constitutional amendment only where:
- ratified meaning is clear;
- implementation deviates;
- correction restores conformance;
- no constitutional meaning changes;
- provenance is preserved.
26.32.17. Constitutional Corrective Action
Where ratified meaning itself is defective, remediation SHALL use a Corrective Amendment.
26.32.18. Corrective Action Object
Every material Corrective Action SHALL possess:
- Corrective Action Identifier;
- triggering finding;
- affected Baseline;
- action class;
- owner;
- authority;
- scope;
- target state;
- deadline;
- validation;
- outcome;
- provenance.
26.32.19. Corrective Action Priority
Priority SHALL consider:
- Protected Invariant impact;
- legal impact;
- tenant impact;
- security;
- Publication impact;
- reversibility;
- number of affected scopes;
- duration.
26.32.20. Continuous Conformance
Continuous conformance MAY monitor:
- Baseline and Manifest integrity;
- authority state;
- Runtime Bundle integrity;
- Extension Set integrity;
- Module and Component lineage;
- tenant isolation;
- migration state;
- Publication state;
- archive state;
- provenance completeness.
26.32.21. Retrospective Review
A Retrospective Review SHALL assess:
- amendment objective;
- actual effects;
- unexpected effects;
- stakeholder concerns;
- migration;
- Extension ecosystem;
- tenant and white-label impact;
- security;
- Publications;
- assurance;
- historical replay;
- need for correction.
26.32.22. Retrospective Review Object
The object SHALL possess:
- Review Identifier;
- Baseline;
- Amendment lineage;
- observation period;
- evidence;
- indicators;
- findings;
- conclusions;
- corrective recommendations;
- reviewer;
- authority;
- provenance.
26.32.23. Retrospective Outcome
Outcome MAY be:
- Objectives Achieved;
- Objectives Achieved with Limitations;
- Corrective Action Required;
- Corrective Amendment Required;
- Transition Extension Required;
- Rollback Recommended;
- Additional Monitoring Required;
- Unable to Conclude.
26.32.24. Stakeholder Feedback
Feedback SHALL preserve:
- source;
- stakeholder class;
- affected scope;
- evidence;
- issue;
- materiality;
- response;
- provenance.
26.32.25. Tenant Impact Review
The review SHOULD evaluate:
- migration burden;
- service disruption;
- Extension failure;
- Publication effects;
- support quality;
- contract effects;
- unresolved exceptions;
- tenant-specific risks.
26.32.26. Extension Impact Review
The review SHOULD evaluate:
- recompile success;
- revalidation success;
- migration;
- invalidations;
- withdrawals;
- partner response;
- tenant-private Extension effects;
- ecosystem fragmentation.
26.32.27. Publication Impact Review
The review SHOULD evaluate:
- correction rate;
- restatement;
- public confusion;
- assurance changes;
- API compatibility;
- dataset compatibility;
- passport compatibility;
- verification continuity.
26.32.28. Monitoring Closure
Monitoring may close only where:
- observation period completes;
- blocking findings are resolved;
- corrective actions are governed;
- residual risks are accepted;
- retrospective review is complete;
- provenance is complete.
26.32.29. Monitoring Receipt
A receipt SHOULD contain:
- Monitoring Plan;
- Baseline;
- observation period;
- indicators;
- findings;
- corrective actions;
- retrospective outcome;
- closure;
- provenance.
26.32.30. Monitoring Validation
HECATE SHALL validate:
- Monitoring Plan;
- indicator identities;
- Baseline binding;
- findings;
- thresholds;
- corrective triggers;
- action authority;
- retrospective review;
- closure;
- provenance.
26.33. Constitutional Incidents, Emergency Suspension and Corrective Evolution
A Constitutional Incident is an event or condition that materially affects the validity, integrity, authority, interpretation, activation, implementation or historical trust of a Constitutional Baseline or Amendment.
Constitutional incident response SHALL preserve the distinction between:
- implementation defect;
- migration defect;
- activation defect;
- security incident;
- invalid ratification;
- defective constitutional meaning;
- Publication defect;
- historical-reconstruction defect.
26.33.1. Constitutional Incident Identity
Every material Constitutional Incident SHALL possess:
- Constitutional Incident Identifier;
- affected Baseline or Baselines;
- affected Amendment lineage;
- affected Runtime Bundles;
- affected Modules;
- affected Components;
- affected Extensions;
- affected tenants and white-label deployments;
- affected Publications;
- incident type;
- detected time;
- incident time;
- severity;
- impact;
- owner;
- lifecycle;
- provenance.
26.33.2. Constitutional Incident Types
Types MAY include:
- Invalid Ratification Incident;
- Baseline Integrity Incident;
- Amendment Package Integrity Incident;
- Compiler Divergence Incident;
- Runtime Admission Incident;
- Baseline Routing Incident;
- Constitutional Drift Incident;
- Protected-Invariant Incident;
- Tenant-Isolation Incident;
- Migration Incident;
- Extension Compatibility Incident;
- Module Ownership Incident;
- Component Conformance Incident;
- Publication Interpretation Incident;
- Historical Replay Incident;
- Authority Compromise Incident;
- Signing-Key Compromise Incident;
- External-Authority Change Incident;
- Emergency-Amendment Expiration Incident.